Gregg, Mike and I have mainly been doing small but necessary
jobs, like getting the office/storage area on the mezzanine sorted, and general
tidying.
From these first 2 pictures looking into the unit you can
see the place as a whole is much tidier. There are 3 phase electric sockets
on the walls, and the obligatory insurance document displayed. You can also
notice a window on the mezzanine.
The shot looking down from the mezzanine again shows the
power sockets, insurance documents and a nice clean floor. I do tend to keep
mentioning the floor, but this has become a huge thorn in our sides, and has
delayed us greatly.
The 2 shots of the mezzanine show where the greatest amount
of work has happened this week. We have finished stuffing the floorboards at
one end with insulation, as the cold room will be constructed below. This has
allowed us to finally get all the new, stronger floorboards down. The kitchen
sink has made it upstairs, and is 75% plumbed in, which means the rest of the kitchen and office will be up there in no time. You can also see we now have
a window looking down to the fermentation area. This was always there, but had
been painted over. Cleaning the paint of has made a big improvement to the
overall feeling of the mezzanine.
The last picture, as always is the back fermentation room,
which has been the office and kitchen for the last few weeks, that and general
store room. Here you can see Gregg and Mike having a discussion about the
layout of the office area on the mezzanine.
Next week’s pictures should show a lot of progress
hopefully. We hope to have a huge hole dug for the drains in the downstairs area and an office
with kitchen on the mezzanine. If all goes well that is.
Fantastic, will all come together with a flourish, Gregg - am off work for 6 weeks, if I can wrangle it to get over I'll be in touch buddy.
ReplyDeleteBrewing is the easy bit it seems.
ReplyDeleteIt is all experience I would not have missed for the world. This last 5 weeks seems to have rushed by.
ReplyDelete